Overview
Watermark cascading throttle that limits incremental updates to 10 per cycle, preventing unbounded recalculation chains in the Direct Runner.
Description
The Direct Runner's `WatermarkManager` tracks input/output watermarks for every `PTransform` in the pipeline. When a bundle completes, watermark updates cascade downstream: updating one transform's output watermark can trigger input watermark updates in all consumers, which in turn trigger their output watermark updates, and so on. Without a limit, a single bundle completion in a deep pipeline could trigger an unbounded cascade of watermark recalculations, starving actual data processing. The `MAX_INCREMENTAL_UPDATES` constant caps this at 10 updates per cycle, deferring remaining updates to the next cycle.
Usage
Apply this heuristic when implementing watermark propagation in a pipeline execution engine. It prevents the scheduling thread from spending all its time recalculating watermarks instead of dispatching work. Also applicable to any cascading update system where one change can trigger a chain of dependent recalculations.
The Insight (Rule of Thumb)
- Action: Limit watermark update cascading to `MAX_INCREMENTAL_UPDATES = 10` per cycle in `tryApplyPendingUpdates`.
- Value: 10 updates per cycle balances watermark freshness against scheduling responsiveness.
- Trade-off: Watermarks may lag slightly behind actual progress in deep pipelines, but the system avoids work starvation.
- Complementary: The executor polls with a 25ms timeout (`Duration.millis(25L)`) to relinquish CPU cores, and uses a 1ms fast-path poll when terminal state is detected.
Reasoning
In a pipeline with N stages, a single element completion could trigger up to N watermark updates (one per stage in the downstream chain). If N is large (e.g., 50+ stages), processing these synchronously blocks the scheduling thread for the entire cascade. By capping at 10, the system processes the most critical updates (nearest to the root) and defers the rest, ensuring that at least some bundles are dispatched between watermark recalculation bursts. The value of 10 was chosen empirically: small enough to keep scheduling responsive, large enough to avoid excessive watermark staleness in typical pipelines (which have fewer than 10 stages on the critical path).
The 25ms poll timeout in `ExecutorServiceParallelExecutor.waitUntilFinish` serves a complementary purpose: it ensures the thread periodically wakes up to check for watermark updates and state changes, even when no visible updates are available. The 1ms fast-path for terminal states accelerates shutdown.
Code Evidence
Watermark update cap from `WatermarkManager.java:136-137`:
// The number of updates to apply in #tryApplyPendingUpdates
private static final int MAX_INCREMENTAL_UPDATES = 10;
Complementary poll intervals from `ExecutorServiceParallelExecutor.java:260-268`:
while (Instant.now().isBefore(completionTime)) {
// Get an update; don't block forever if another thread has handled it.
// The call to poll will wait the entire timeout; this call primarily
// exists to relinquish any core.
VisibleExecutorUpdate update = visibleUpdates.tryNext(Duration.millis(25L));
if (update == null && pipelineState.get().isTerminal()) {
// state and updates have separate locks so it is possible for an
// update to be posted in a race.
update = visibleUpdates.tryNext(Duration.millis(1L));