Jump to content

Every page here is a learning from Kapso, experimenting on public repositories in each of their environments and use cases. Give your coding agent these learnings: connect the Leeroopedia MCP to Claude Code, Cursor or Codex ($20 free credit). Powered by Leeroo · founders@leeroo.com

Heuristic:AI4Finance Foundation FinRobot IRR Hurdle Gate Override

From Leeroopedia
Knowledge Sources
Domains Private_Equity, Decision_Gate, Debugging
Last Updated 2026-10-19 00:00 GMT

Overview

Override the LLM's qualitative IC recommendation to PASS when the deterministic LBO IRR falls below the 15% sponsor hurdle (or is undefined), so the code gate — not the narrative — is the final authority on deal feasibility.

Description

In an AI-assisted investment memo, the LLM writes the recommendation narrative, but the code enforces a non-negotiable gate: if `lbo_result.irr < SPONSOR_IRR_HURDLE` (15%), the recommendation is overridden to PASS regardless of what the LLM wrote. The gate prepends a mandatory `[CODE GATE: LBO IRR X% is below the 15% minimum hurdle. Recommendation overridden to: PASS]` prefix to the LLM's output.

An undefined IRR (`None` — impossible capital structure, entry equity ≤ 0) cannot clear the hurdle, so it falls through the same PASS gate. The hurdle is a shared leaf constant (`SPONSOR_IRR_HURDLE = 0.15`) consumed by two LBO consumers that must speak the same bar: the IC-memo recommendation gate and the valuation aggregator's LBO ability-to-pay band (which discounts exit equity back to today at this rate).

Usage

Use this heuristic whenever you produce an IC recommendation from an LLM on top of a deterministic LBO result. Apply it when:

  • The LLM might recommend a deal (BUY/PASS) based on qualitative reasoning.
  • The LBO IRR is below 15% (or undefined due to an impossible capital structure).
  • You need the final recommendation to reflect the sponsor's non-negotiable return bar.

The Insight (Rule of Thumb)

  • Action: In `_execute_recommendation`, after the LLM produces its recommendation, check `ic_financials.lbo_result.irr`:
    • `irr is None` → override to PASS (undefined IRR = impossible structure)
    • `irr < _IRR_HURDLE` (0.15) → override to PASS
    • `irr >= _IRR_HURDLE` → let the LLM's recommendation stand
  • Value: `SPONSOR_IRR_HURDLE = 0.15` (15%). The project's long-standing IC bar. Textbook sponsor hurdles run 20–25% (Rosenbaum & Pearl Ch.8); 15% is calibrated to the project's bar and shared by the ability-to-pay band.
  • Trade-off: A borderline deal at 15.1% passes the gate even though the LLM might have flagged qualitative risks. The gate is a floor, not a ceiling — it only forces PASS down, never forces BUY up.
  • Shared constant: Lives in `valuation_thresholds.py` (a leaf) so the IC gate and the football-field ability-to-pay band speak the same hurdle. Raising it tightens both consumers together.

Reasoning

In private equity, the IRR hurdle is non-negotiable — a sponsor will not pursue a deal returning 8% when their hurdle is 15%, regardless of how compelling the narrative is. An LLM reasoning qualitatively may miss or under-weight the quantitative bar; the code gate ensures the deterministic IRR is the final authority. An undefined IRR (entry equity ≤ 0 — impossible capital structure) is treated as a fail because returns are undefined there, not a total loss: forcing `moic=0/irr=-1` would read as "total wipeout" when exit equity may even be positive — the opposite signal. The gate treats `None` the same as `< hurdle`: the deal does not clear.

The 15% bar is shared with the valuation aggregator's LBO ability-to-pay band, which discounts the t+N exit equity back to today at this rate (`PV = exit_equity/(1+r)^N`). Undiscounted exit equity is a future value — plotting it next to PV methods (DCF) overstates the LBO row ~2× over a 5y hold.

Code Evidence

Shared hurdle constant from `valuation_thresholds.py:129`:

SPONSOR_IRR_HURDLE = 0.15

Gate wiring from `ic_memo.py:61-62`:

# IC gate and the football field speak the same hurdle.
_IRR_HURDLE = SPONSOR_IRR_HURDLE

Code-level override from `ic_memo.py:178-190`:

if isinstance(ic_financials, ICFinancials):
    irr = ic_financials.lbo_result.irr
    # An undefined IRR (None — impossible capital structure, entry equity ≤ 0)
    # cannot clear the hurdle, so it falls through the same PASS gate.
    if irr is None or irr < _IRR_HURDLE:
        irr_label = f"{irr:.1%}" if irr is not None else "undefined (entry equity ≤ 0)"
        gate_text = (
            f"[CODE GATE: LBO IRR {irr_label} is below the {_IRR_HURDLE:.0%} minimum hurdle. "
            f"Recommendation overridden to: PASS]\n\n"
        )
        return StepOutput(text=gate_text + step_result.output, structured=None)

Related Pages

Page Connections

Double-click a node to navigate. Hold to expand connections.
Principle
Implementation
Heuristic
Environment